Information on NPP Dukovany 03/02/2010
Homepage » CEZ Group » Media » Nuclear Power Plant news » Information on NPP Dukovany 03/02/2010
3. 2. 2010
Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El. production since the beginning of operation: 309 533 822 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 467 MWe
- Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 464 MWe
- Unit 3 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 501 MWe
- Unit 4 is in Mode 1 - power conditions, Reactor power is 100 %, Turbine generator output – 464 MWe
Electricity production since the beginning of the year: 1 426 856 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany
Menu: