12. 3. 2010
Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El. production since the beginning of operation: 311 066 726 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
- Unit 1 is in Mode 1 – power conditions, Reaktor power is 100 %, Turbine generator output – 469 MWe
- Unit 2 is in Mode 1 - power conditions, Reaktor power is 100 %, Turbine generator output – 463 MWe
- Unit 3 is in Mode 6 – refueling – shutdown with primary circuit open
- Unit 4 is in Mode 1 – power conditions, Reactor power is 100 %, Turbine generator output – 467 MWe
Electricity production since the beginning of the year: 2 959 760 MWh.
Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany