Information from the NPP Temelín 165 / 2010
Homepage » CEZ Group » Media » Nuclear Power Plant news » Information from the NPP Temelín 165 / 2010
25. 8. 2010
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1 today on August 25, 2010 at 8:45 o‘clock:
- Unit is in Mode 6
- Reactor power is 0 %
- Turbine generator output - 0 MWe
- Electricity production since the beginning of the year: 4 726 143 MWh
Information on parameters at Unit 2 today on August 25, 2010 at 8:45 o‘clock:
- Unit is in Mode 1 - power operation
- Reactor power is 100 %
- Turbine generator output - 1008 MWe
- Electricity production since the beginning of the year: 4 133 305 MWh