Wind Power Plant
Homepage » Power Plants and Environment » Wind Power Plant
CEZ Group is planning to build wind power stations with a total installed capacity of 1,000 MW by 2020.
The first Wind Power Plant of CEZ, a. s., having 315 kW of power output, commenced its trial operation in Krusne Mountains (the Dlouha Louka u Oseka location) in November 1993. In 2007 it was decommissioned.
Intention of Construction of Resice Wind Park
The current intention supposes construction of the largest onshore farm in Europe with a total installed capacity of 600 MW.
Menu: