Information on NPP Dukovany 12/1/2018

12. 1. 2018

Units 1, 2, 3, 4 are operated on power operation. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 419 532 311 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

  • Unit 1 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 501 MWe
  • Unit 2 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 503 MWe
  • Unit 3 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 499 MWe
  • Unit 4 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 501 MWe

Electricity production since the beginning of the year:  459 805 MWh.

Ing. Jiří Bezděk
Spokesman of the ČEZ Group
Nuclear Power Plant Dukova
ny