Information on Dukovany NPP 11/03/2009

Úvod » Pro média » Aktuality z jaderných elektráren » Archiv aktuality z jaderných elektráren » Information on Dukovany NPP 11/03/2009

11. 3. 2009

Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 296 564 053 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 468 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 462 MWe

Unit 3 is in Mode 6 -  refueling – shutdown with primary circuit open

Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 467 MWe

 

 Electricity production since the beginning of the year:  2 412 205 MWh.

 

 

Menu:
FAQ  Fotografie  Jaderné elektrárny  Loga  Magazín ČEZ News Statistiky  Tiskové zprávy  Videa 

Důležité kontakty

  • Zákaznická linka840 840 840
  • Poruchová linka840 850 860

Další kontaktyNapište nám

content NOT FOUND (404) - /www/cs/popbubbles.html