We provide electricity distribution for our customers within the meaning of Act No. 458/2000 Sb.
HEAD OF VÍTKOVICE ELECTRICITY DISTRIBUTION
Mobile: +420 737 765 709
E-mail: zdenek.flagar@cez.cz
| Transmission capacity in the defined area [MW] | ||
|---|---|---|
| 376 | ||
| Voltage level [kV] | Cable distribution length [km] | Distribution type |
| 0,400 | 10,000 | Cable |
| 0,500 | 15,000 | Cable |
| 5,000 | 25,000 | Cable |
| 6,000 | 26,000 | Cable |
| 22,000 | 70,000 | Cable |
| Transformer station | ||
| Input voltage [kV] | Output voltage [kV] | Number |
| 5,000 | 0,400 | 3 |
| 6,000 | 0,400 | 3 |
| 22,000 | 5,000 | 3 |
| 22,000 | 6,000 | 4 |
| 110,000 | 22,000 | 3 |
| Cadastral territory | Cadastre code | Area |
| Moravská Ostrava | 713520 | Ostrava |
| Mariánské Hory | 713830 | Ostrava |
| Nová Ves u Ostravy | 713937 | Ostrava |
| Zábřeh-Hulváky | 713970 | Ostrava |
| Vítkovice | 714071 | Ostrava |
| Zábřeh-VŽ | 714089 | Ostrava |
| Hrabůvka | 714585 | Ostrava |
| The name of the investment project | Year of implementation | |
|---|---|---|
| 1 | Replacement of transformer T15 to R8/II including power supply substations | 2021 |
| 2 | Reconstruction of 22kV substation No. 5,6 at R8/II | 2021 |
| 3 | Reconstruction of part of the LV distribution network connected from R8/VI | 2021 |
| 4 | Replacement of TL1 choke on R8/II | 2022 |
| 5 | Replacement, reconstruction of part of the cable connection 5, 22kV, R8/II – R15/I – R5/II | 2022 |
| 6 | Reconstruction of R15/I substation | 2022 - 2023 |
| 7 | Reconstruction – relocation of K11 substation | 2023 |
| 8 | Reconstruction of substation No. 3, 22kV – primary side T2, at R2/I | 2023 |
| 9 | Reconstruction of substation No. 316, 6kV – secondary side of T2, at R2/I | 2023 |
| 10 | Reconstruction – extension of MV distribution lines fed from R15/Ia | 2023 - 2024 |
| 11 | Reconstruction of R3/V substation – MV and LV | 2024 |
| 12 | Replacement of TL1, TL2, TL3 chokes at R8/III (change of current control range) | 2024 |
| 13 | Replacement of T3 22/6kV transformer to R2/I | 2024 |
| 14 | Replacement (relocation to the power bridge) of cable connection No.5,6 22kV R8/III – R2/I | 2025 |
| 15 | Addition of switching element status signaling at R2/V to MKD | 2025 |
| 16 | Replacement of transformer T16 to R8/II including power supply substations | 2025 |
| 17 | Reconstruction of the power cable connection – R3/I | 2025 |
| Document | Type | Size |
|---|---|---|
| Annual operation preparation 2017 | 807 kB | |
| Annual operation preparation 2018 | 774 kB | |
| Annual operation preparation 2019 | 522 kB | |
| Annual operation preparation 2020 | 487 kB | |
| Annual operation preparation 2021 | 395 kB |