Nuclear Power Plant news pg. 1
INFORMATION ON NPP TEMELÍN 87 / 2024
Unit 1 is in the planned outage for refuelling. Unit 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
7. 5. 2024
Information on NPP DUKOVANY 7/5/2024
Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 511 235 157 MWh.