23. 8. 2010

Information from the NPP Temelín 163 / 2010

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on August 23, 2010 at 9:15 o‘clock:

  • Unit is in Mode 6
  • Reactor power is 0 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 4 726 143 MWh

Information on parameters at Unit 2 today on August 23, 2010 at 9:15 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1006 MWe
  • Electricity production since the beginning of the year: 4 084 894 MWh

 
Václav BROM
ČEZ Group Spokesman
Nuclear Power Plant Temelín