Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 322 977 514 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

 

  • Unit 1 is in Mode 1 – power operation, Reaktor power is 100 %, Turbine generator output – 468 MWe
  • Unit 2 is in Mode 1 - power operation, Reaktor power is 100 %, Turbine generator output – 461 MWe
  • Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output – 500 MWe
  • Unit 4 is in Mode 1 – power operation, Reactor power is 99 %, Turbine generator output – 500 MWe

 

 

Electricity production since the beginning of the year:  694 991 MWh.

   