20. 9. 2011

Information on NPP Dukovany 19/9/2011

Units 2, 3, 4 are operated at full rated power. Unit 1 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 333 075 294 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

 

  • Unit 1 is in Mode 7 – total fuel removal from reactor core
  • Unit 2 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 462 MWe
  • Unit 3 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 493 MWe
  • Unit 4 is in Mode 1 – power operation, Reactor power is 99,6 %, Turbine generator output – 497 MWe

 

Electricity production since the beginning of the year:  10 792 771 MWh.

 

 

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany