2. 11. 2011

Information on NPP Dukovany 2/11/2011

Units 2, 3, 4 are operated at full rated power. Unit 1 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 334 292 908 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

 

  • Unit 1 is in Mode 6 – refueling – shutdown with primary circuit open
  • Unit 2 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 466 MWe
  • Unit 3 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 501 MWe
  • Unit 4 is in Mode 1 – power operation, Reactor power is 99,5 %, Turbine generator output – 500 MWe

 

Electricity production since the beginning of the year:  12 010 385 MWh.

 

 

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany