22. 3. 2011

Information on NPP Dukovany 22/3/2011

Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage.All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 325 556 539 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

 

  • Unit 1 is in Mode 1 – power operation, Reaktor power is 100 %, Turbine generator output – 468 MWe
  • Unit 2 is in Mode 1 – power operation, Reaktor power is 97,1 %, Turbine generator output – 450 MWe
  • Unit 3 is in Mode 5 – cold shutdown
  • Unit 4 is in Mode 1 – power operation, Reactor power is 99,3 %, Turbine generator output – 498 MWe

 

 

Electricity production since the beginning of the year:  3 274 016 MWh.

   

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany