23. 3. 2011

Information on NPP Dukovany 23/3/2011

Units 1, 2, 4 are operated at full rated power. The Unit 3 is in a startup mode after refuelling. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 325 590 404 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

 

  • Unit 1 is in Mode 1 – power operation, Reaktor power is 100 %, Turbine generator output – 466 MWe
  • Unit 2 is in Mode 1 – power operation, Reaktor power is 96,6 %, Turbine generator output – 447 MWe
  • Unit 3 is in Mode 4 – hot shutdown
  • Unit 4 is in Mode 1 – power operation, Reactor power is 99,5 %, Turbine generator output – 496 MWe

 

 

Electricity production since the beginning of the year:  3 307 881 MWh.

 

 

Ing. Petr Spilka
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany