Unit 1 is operated in the power effect of reactivity mode. Unit 2 is in operation at planned power. All auxiliary systems of the power plant are working in accordance with the operation needs.

Information on parameters at Unit 1 today on November 8, 2010 at 09:00 o‘clock:

  • the Unit is in operation in the power effect mode at the close of the fuel cycle 
  • Reactor power is 94,5 %
  • Turbine generator output - 952 MWe
  • Electricity production since the beginning of the year:  4 533 639 MWh

Information on parameters at Unit 2 today on November 8, 2010 at 09:00 o‘clock:

  • the Unit is in Mode 1
  • Reactor power is 100 %
  • Turbine generator output - 1008 MWe
  • Electricity production since the beginning of the year:  2 985 096 MWh

 

Václav BROM
ČEZ Group Spokesman
Nuclear Power Plant Temelín