23. 9. 2016

INFORMATION ON NPP TEMELÍN 187 / 2016

At the Units 1 a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The Unit 2 is in the outage for the revision of the turbine bearing stands sealing system. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on September 23, 2016 at 11:00 o‘clock:

  • Unit is in the outage
  • Turbine generator output – 0 MWe
  • Electricity production since the beginning of the year: 5 955 857 MWh

Information on parameters at Unit 2 today on September 23, 2016 at 11:00 o‘clock:

  • Unit is in the outage
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 4 081 806 MWh

  

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín