14. 10. 2009

Information on NPP Temelín 198 / 2009

Unit 2 is in operation at planned power. Unit 1 is being prepared for start after the outage. All auxiliary systems of the power plant are working in accordance with the operation needs.

Information on parameters at Unit 1 today on October 14, 2009 at 9:30 o‘clock:

  • Unit is in Mode 2
  • Reactor power is 0 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 5 072 238 MWh

Information on parameters at Unit 2 today on October 14, 2009 at 9:30 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output – 1006 MWe
  • Electricity production since the beginning of the year: 4 815 254 MWh

  

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín