4. 11. 2005

Information on NPP Temelín 215 / 2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

November 4, 2005

Information on parameters at Unit 1 today on November 4, 2005 at 08:30 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 980 MW
· Electricity production since the beginning of the year: 4 767 972 MWh

Information on parameters at Unit 2 today on November 4, 2005 at 08:30 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 80 %
· Turbine generator output - 779 MW
· Electricity production since the beginning of the year: 4 147 314 MWh

Milan Nebesář
ČEZ, a.s. Spokesman