14. 11. 2005

Information on NPP Temelín 221/2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

November 14, 2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

Information on parameters at Unit 1 today on November 14, 2005 at 08:00 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 977 MW
· Electricity production since the beginning of the year: 5 003 053 MWh

Information on parameters at Unit 2 today on November 14, 2005 at 08:00 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 76 %
· Turbine generator output - 723 MW
· Electricity production since the beginning of the year: 4 327 049 MWh

Milan Nebesář
ČEZ, a.s. Spokesman