5. 12. 2005

Information on NPP Temelín 235/2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

December 5, 2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

Information on parameters at Unit 1 today on December 5, 2005 at 08:30 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 981 MW
· Electricity production since the beginning of the year: 5 456 285 MWh

Information on parameters at Unit 2 today on December 5, 2005 at 08:30 o’clock:
· Unit is in Mode 1 - power operation
· Reactor power is 85 %
· Turbine generator output – 819 MW
· Electricity production since the beginning of the year: 4 715 056 MWh

Milan Nebesář
ČEZ, a.s. Spokesman