Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on March 18, 2009 at 9:15 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1021 MWe
  • Electricity production since the beginning of the year: 1 820 537 MWh

Information on parameters at Unit 2 today on March 18, 2009 at 9:15 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1010 MWe
  • Electricity production since the beginning of the year: 1 841 142 MWh

 