Information on parameters at Unit 1 today on March 18, 2009 at 9:15 o‘clock:
- Unit is in Mode 1 - power operation
- Reactor power is 100 %
- Turbine generator output - 1021 MWe
- Electricity production since the beginning of the year: 1 820 537 MWh
Information on parameters at Unit 2 today on March 18, 2009 at 9:15 o‘clock:
- Unit is in Mode 1 - power operation
- Reactor power is 100 %
- Turbine generator output - 1010 MWe
- Electricity production since the beginning of the year: 1 841 142 MWh
Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín