9. 1. 2006

Information on NPP Temelín 6/2006

The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor.

January 9, 2006

The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor. All auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on January 9, 2006 at 07:15 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 97%
· Turbine generator output - 982 MW
· Electricity production since the beginning of the year: 177 133 MWh

Information on parameters at Unit 1 today on January 9, 2006 at 07:15 o‘clock:
· Unit is in Mode 6
· Reactor power is 0%
· Turbine generator output - 0 MW
· Electricity production since the beginning of the year: 54 079 MWh

Milan Nebesář
Spokesman of the Temelín NPP