Information on parameters at Unit 1 today on March 30, 2009 at 10:45 o‘clock:
- Unit is in Mode 1 - power operation
- Reactor power is 100 %
- Turbine generator output - 1021 MWe
- Electricity production since the beginning of the year: 2 113 403 MWh
Information on parameters at Unit 2 today on March 30, 2009 at 10:45 o‘clock:
- Unit is in Mode 1 - power operation
- Reactor power is 93 %
- Turbine generator output - 936 MWe
- Electricity production since the beginning of the year: 2 124 659 MWh
Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín