8. 4. 2009

Information on NPP Temelín 68 / 2009

Unit 1 is in operation at full rated power. Unit 2 is operated in the mode of power effect of reactivity. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on April 8, 2009 at 09:15 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1015 MWe
  • Electricity production since the beginning of the year: 2 306 703 MWh

Information on parameters at Unit 2 today on April 8, 2009 at 09:15 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 87 %
  • Turbine generator output - 865 MWe
  • Electricity production since the beginning of the year: 2 319 800 MWh

 

Václav BROM
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín