Information on NPP Temelín 85 / 2009

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on May 5, 2009 at 13:45 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1014 MWe
  • Electricity production since the beginning of the year: 2 964 071 MWh

Information on parameters at Unit 2 today on May 5, 2009 at 13:45 o‘clock:

  • Unit is in Mode 6
  • Reactor power is 0 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 2 637 372 MWh

 