Nuclear Power Plant news pg. 2564

JE Temelin traffic

Information on NPP Temelín 131/2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.

10. 7. 2006

JE Temelin traffic

Information on NPP Temelín 130/2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.

7. 7. 2006

JE Temelin traffic

Information on NPP Temelín 129 / 2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

4. 7. 2006

JE Temelin traffic

Information on NPP Temelín 128 / 2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.

3. 7. 2006