Nuclear Power Plant news pg. 1212
Information on NPP Temelín 211/2005
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
31. 10. 2005
Information on NPP Temelín 209 / 2005
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
27. 10. 2005
The Temelín Power Plant acquired the valuation Safe Enterprise
The Temelín Power Plant acquired, together with another 9 Czech firms, the valuation Safe Enterprise. Hereby, it ranked with the Dukovany Power Plant (which defended the certificate today) in the society of 52 enterprises of the Czech Republic that hold this valuation of Industrial Safety level.