Nuclear Power Plant news pg. 2561

JE Temelin traffic

Information on NPP Temelín 248/2005

Unit 1 is shut down to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.

22. 12. 2005

JE Temelin traffic

Information on NPP Temelín 247/2005

Unit 1 is shut down since Saturday morning to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.

21. 12. 2005

Others

State-owned shares in Severoceske doly transferred to CEZ

Today, 55.792 per cent of shares in Severoceske doly owned by FNM CZ (National Property Fund) have been transferred to CEZ and the whole transaction has been settled. CEZ has increased its present 37.31% share in this company to 93.102 % by this step. The purchase price was 9,046m CZK.

20. 12. 2005

JE Temelin traffic

Information on NPP Temelín 246/2005

Unit 1 is shut down since Saturday morning to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.

20. 12. 2005