Nuclear Power Plant news pg. 2563
Information on NPP Temelín 1/2006
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.
2. 1. 2006
Information on NPP Temelín 251/2005
Unit 1 is shut down to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.