Nuclear Power Plant news pg. 2568

JE Temelin traffic

Information on NPP Temelín 230/2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

28. 11. 2005

Others

SMOKING FINISHED! A blast of the highest-ever chimney of reinforced concrete in the Czech Republic

196 metres high chimney of Tusimece I power plant (ETU I) will come to the end of its operational life once and for all today. The chimney will be blasted within the demolition of the shut-down ETU I plan. A heap of debris of reinforced concrete weighing more than 10 thousand tons will remain of the past dominant of the plant.

28. 11. 2005

JE Temelin traffic

Information on NPP Temelín 229/2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

25. 11. 2005

JE Temelin traffic

Information on NPP Temelín 228/2005

Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.

24. 11. 2005