Skip to Content

Information on NPP DUKOVANY 14/10/2025

Units 1, 3, 4 are in the operation. The Unit 2 is in the outage for refueling. Electricity production since the beginning of the operation: 532 116 459 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 514 MWe
Unit 2 is in Mode 6 - outage
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 510 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 515 MWe

Electricity production since the beginning of the year: 11 322 521 MWh.