Skip to Content

Information on NPP DUKOVANY 19/8/2025

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 529 960 037 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 505 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 505 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 509 MWe

Electricity production since the beginning of the year: 9 166 100 MWh.

News on the topic
First Westinghouse nuclear fuel arrives in Dukovany
Czech Nuclear Power Plants Comply with International Environmental Protection Standards