3. 3. 2016

Information on NPP Dukovany 3/3/2016

Units 1, 2, 3 are operated on power operation. Unit 4 is scheduled shutdown for refuelling. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 396 799 249 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

  • Unit 1 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 500 MWe
  • Unit 2 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 503 MWe
  • Unit 3 is in Mode 1 – power operation, Reactor power is 100 %, Turbine generator output – 501 MWe
  • Unit 4 is in Mode 7 – refuelling – planned outage

Electricity production since the beginning of the year: 1 541 248 MWh.

Ing. Jiří Bezděk
Spokesman of the ČEZ Group
Nuclear Power Plant Dukovany