Both Unit 1 and 2 are in operation at planned power level. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on October 10, 2012 at 13:45 o‘clock:

  • Unit is in Mode 1 – power operation
  • Reactor power is 100 %
  • Turbine generator output - 1015 MWe
  • Electricity production since the beginning of the year: 5 527 128 MWh

Information on parameters at Unit 2 today on October 10, 2012 at 13:45 o‘clock:

  • Unit is in Mode 1 – power operation
  • Reactor power is 100 %
  • Turbine generator output - 1015 MWe
  • Electricity production since the beginning of the year: 5 715 543 MWh

 