14/10/2025
INFORMATION ON NPP TEMELÍN 200 / 2025
Both Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- The power of the reactor – 100 %
- Electricity production since the beginning of the year: 6 010 177 MWh
Information on parameters at Unit 2:
- The power of the reactor – 100 %
- Electricity production since the beginning of the year: 7 248 725 MWh
News on the topic