Nuclear Power Plant news pg. 2219

JE Dukovany traffic

Information on NPP Dukovany 10/12/2010

Units 1, 2, 3 are operated at full rated power. The Unit 4 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 321 512 311 MWh.

10. 12. 2010

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 236 / 2010

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

9. 12. 2010

JE Dukovany traffic

Information on NPP Dukovany 8/12/2010

Units 1, 2, 3 are operated at full rated power. The Unit 4 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 321 443 405 MWh.

8. 12. 2010

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 235 / 2010

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

8. 12. 2010