Nuclear Power Plant news pg. 2240
Information on NPP Temelín 180 / 2010
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
15. 9. 2010
Information on NPP Dukovany 15/9/2010
Units 2, 3, 4 are operated at full rated power. Unit 1 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 318 800 036 MWh.