Nuclear Power Plant news pg. 2249

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 159 / 2010

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

17. 8. 2010

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 158 / 2010

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

16. 8. 2010

JE Temelin traffic

INFORMATION ON NPP TEMELÍN 157 / 2010

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

13. 8. 2010

JE Temelin traffic

Information on NPP Temelín 156 / 2010

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

12. 8. 2010