Nuclear Power Plant news pg. 2250

JE Temelin traffic

Information on NPP Temelín 155 / 2010

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

11. 8. 2010

JE Temelin traffic

Information on NPP Temelín 154 / 2010

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

10. 8. 2010

JE Dukovany traffic

Information on NPP Dukovany 10/8/2010

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 317 241 047 MWh.

10. 8. 2010

JE Dukovany traffic

Information on NPP Dukovany 9/8/2010

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 317 196 771 MWh.

9. 8. 2010