Nuclear Power Plant news pg. 2251
Information on NPP Temelín 152 / 2010
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
6. 8. 2010
Information on NPP Dukovany 5/8/2010
Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 317 020 898 MWh.