JE Dukovany traffic

Information on NPP Dukovany 12/03/2010

Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El. production since the beginning of operation: 311 066 726 MWh.

12. 3. 2010

JE Temelin traffic

Information on NPP Temelín 50 / 2010

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

12. 3. 2010

JE Temelin traffic

Information on NPP Temelín 49 / 2010

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

11. 3. 2010

JE Dukovany traffic

Information on NPP Dukovany 11/3/2010

Units 1, 2, 4 are operated at full rated power. Unit 3 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. El. production since the beginning of operation: 311 033 025 MWh.

11. 3. 2010