Nuclear Power Plant news pg. 2334

JE Temelin traffic

Information on NPP Temelín 172 / 2009

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of a part of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

4. 9. 2009

JE Dukovany traffic

Information on NPP Dukovany 03/09/2009

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 303 694 828 MWh.

3. 9. 2009

JE Dukovany traffic

Information on NPP Dukovany 02/09/2009

Units 1, 2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. El.production since the beginning of operation: 303 650 489 MWh.

2. 9. 2009

JE Temelin traffic

Information on NPP Temelín 170 / 2009

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of a part of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

2. 9. 2009