Nuclear Power Plant news pg. 2361
Information on NPP Temelín 101 / 2009
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
28. 5. 2009
Information on NPP Dukovany 27/05/2009
Units 1,2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 299 306 075 MWh.
27. 5. 2009
Information on NPP Temelín 100 / 2009
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.
27. 5. 2009
Information on NPP Temelín 99 / 2009
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.