JE Temelin traffic

Information on NPP Temelín 98 / 2009

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

25. 5. 2009

JE Temelin traffic

Information on NPP Temelín 97 / 2009

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

22. 5. 2009

JE Temelin traffic

Information on NPP Temelín 96 / 2009

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

21. 5. 2009

JE Dukovany traffic

Information on NPP Dukovany 21/05/2009

Units 1,2, 3, 4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 299 038 388 MWh.

21. 5. 2009