Nuclear Power Plant news pg. 2624

JE Dukovany traffic

Information on Dukovany NPP, September 25th 2006

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 262 417 068 MWh.

25. 9. 2006

JE Temelin traffic

Information on NPP Temelín 188/2006

Unit 1 is in operation on planned power level. At Unit 2, the planned outage is continued that is connected with the yearly replacement of ¼ of the reactor fuel.

25. 9. 2006

JE Temelin traffic

Information on NPP Temelín 187 / 2006

Unit 1 is in operation on planned power level. The technicians are preparing for the turbine shutdown to be performed within the next days for several hours in order to carry out repairs of the failure in the control oil system of one out of four valves supplying thesteam to the turbine.

22. 9. 2006

JE Temelin traffic

Information on NPP Temelín 186/2006

Unit 1 is in operation on planned power level. The technicians are preparing for the turbine shutdown to be performed within the next days for several hours in order to carry out repairs of the failure in the control oil system of one out of four valves supplying thesteam to the turbine.

21. 9. 2006