Nuclear Power Plant news pg. 2629
Information on Dukovany NPP, September 14th 2006
Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 261 972 649 MWh.
14. 9. 2006
Information on NPP Temelín 181 / 2006
Unit 1 is in operation on planned power level. At Unit 2, the planned outage is continued that is connected with the yearly replacement of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.
14. 9. 2006
Information on NPP Temelín 180 / 2006
Unit 1 is in operation on planned power level. At Unit 2, the planned outage is continued that is connected with the yearly replacement of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.
13. 9. 2006
Information on NPP Temelín 179 / 2006
Unit 1 is in operation on planned power level. At Unit 2, the planned outage is continued that is connected with the yearly replacement of ¼ of the reactor fuel. All auxiliary systems are working in accordance with the operation needs of individual units.