Nuclear Power Plant news pg. 2638
Information on NPP Temelín 157/2006
Unit 2 is in operation at planned power level. At Unit 1, the technicians are carrying out a series of reactor core physics tests. After their termination, they will synchronize the Unit with the distribution grid.
11. 8. 2006
Information on NPP Temelín 156/2006
Unit 2 is in operation at planned power level. At Unit 1, the technicians are carrying out a series of reactor core physics tests. After their termination, they will synchronize the Unit with the distribution grid.