Nuclear Power Plant news pg. 2680
Information on NPP Temelín 245/2005
Unit 1 is shut down since Saturday morning to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.
19. 12. 2005
Information on NPP Temelín 244/2005
Unit 1 and Unit 2 are in operation at planned power level. All auxiliary systems are working in accordance with the operation modes of individual units.