Nuclear Power Plant news pg. 275
INFORMATION ON NPP TEMELÍN 84 / 2023
Unit 1 is in the planned outage for refuelling. Unit 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
2. 5. 2023
Information on NPP DUKOVANY 2/5/2023
Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 496 828 779 MWh.