Skip to Content

The Brno Kníničky
Hydro Power Station

Kníničky Hydropower Plant under the Brno reservoir in Brno-Bystrc was designed as a peak source destined to overlay increased electrical energy consumption at morning and evening peaks. It was put into operation in 1941.

Kníničky Hydropower Plant under the Brno reservoir in Brno-Bystrc was designed as a peak source destined to overlay increased electrical energy consumption at morning and evening peaks. It was put into operation in 1941. It is equipped with a vertical turbo-generating set with a Kaplan turbine produced by the Storek firm. Although the turbine´s maximal usable flow is 22 m3/sec, it optimally operates at the maximum usable flow of 17-18 m3/sec. The installed capacity of the plant of 3,100 kW is reached at maximum head heights. The technological equipment, except 3 single phase dry-type transformers, is original.

Photogallery
12_kninicky.jpg
11_kninicky.jpg
10_kninicky.jpg
09_kninicky.jpg
08_kninicky.jpg
01_kninicky.jpg
06_kninicky.jpg
05_kninicky.jpg
04_kninicky.jpg
03_kninicky.jpg
02_kninicky.jpg
07_kninicky.jpg